Stream Bottom Dredging Between Kurbagalidere Recep Peker Bridge And Sea Of Marmara

Subject of Work :

  • 70.000 m3 stream bottom cleaning between depths of -7 m and -10 m
  • Construction of sea water discharging line 600 m in length