Sea Bottom Dredging Project At The Port Of Safiport

Subject of Work :

  • Dredging of 2.000.000 m3 of sea bottom at dredging depths of -7, -12 and -17 m
  • Discharge of the dredged material into the sea at a distance of 48 naval miles in the Sea of Marmara