Akkuyu Nuclear Power Plant Worksite

Subject of Work :

  • Eastern Cargo Port
  • 63.000 m3 of Sea Bottom Loose Material Dredging
  • Western Cargo Port
  • 100.000 m3 of Sea Bottom Dredging
  • 470 m Underwater Levelling Work
  • Construction of Dock Made of Concrete Blocks to be İnstalled From The Sea
  • Bollards and Bollard Anchorage

Dismantling of Old Breakwater :

  • 1900 Pieces 20 Ton Concrete Blocks
  • 100.000 Ton Riprap
  • Removal of 250.000 , 0-0,400 core material