Subject of Work :
- Fabrication of 108 bored piles 1.000 mm in diameter
- Fabrication of 15.000 m jet grout 80 cm in diameter
- 3.700 m3 capping beam work
- 470 m3 (86 pcs) precast wall fabrication and installation
- 2.600 m tie rod installation
- 10.000 m2 site concrete fabrication