Sedef Shipyard Dockside Earth Site Pile Driving – Filling and Landscaping Works

Subject of Work :

  • Fabrication of 108 bored piles 1.000 mm in diameter
  • Fabrication of 15.000 m jet grout 80 cm in diameter
  • 3.700 m3 capping beam work
  • 470 m3 (86 pcs) precast wall fabrication and installation
  • 2.600 m tie rod installation
  • 10.000 m2 site concrete fabrication
Sedef Shipyard

Pile Driving

Filling

Landscaping Works