Ekol Lojistik Yalova Ro-Ro Terminal Construction Sea Bottom Dredging

Subject of Work :

  • 120.000 m3 sea bottom dredging down to a depth of -9.50 m
  • Cutting of 120 steel piles driven previously at the dredging level after dredging and floating thereof on the sea and then stowage thereof
Yalova

Ro-Ro Terminal

Sea Bottom Dredging